4/30/2023 0 Comments Kalispell udigHe added the project represents both public and private efforts. "You can walk 10 miles and you don't have to worry about getting run over." "I think it's the coolest concept, that walking trail," he said. The Kalispell Parkline Trail, which is finally under construction after about a decade of planning, runs right along Ruis' new property. "That part of the town can really stand to have this type of … to tie both sides of town together to make them equal," he said. Ruis said the location drew him to the property. "How cool is that to be an attraction in the city in Kalispell? It's really, really fun," he said. Ruis said he has two additional projects in the works elsewhere in the valley, which together would add another 280 housing units.īut there's nothing quite like the Kalispell grain silo site.įrom the top floor of the restaurant 100 feet high, Ruis said it will be possible to gaze out across almost the entire valley. They had planned to wait until 2022 to build the hotel and restaurant but got a head start on the second phase of construction this year. Ruis said his team is ahead of schedule on that project. THE AMBITIOUS Kalispell redevelopment joins Ruis' ongoing effort on Nucleus Avenue in Columbia Falls, where he is building 48 apartments atop a retail space, a 30-room hotel, and a restaurant and sports bar. "We'll be ready to rock and roll to get that project finished by the end of 2022." "We're going to have everything stocked up," he said. He said construction should start this year and he hopes to finish the project on a short timeline, noting he bought a few warehouses to stockpile supplies that have become hard to find amid the COVID-19 pandemic. Ruis has contracted with Jackola Engineering to get the project off the ground. The complex also would offer ground-level covered parking for tenants. The four-story apartment buildings would come in a variety of layouts, mostly two-bedroom units, he said. Ruis wants to build a bar and restaurant atop two of the old grain elevators and about 230 residential units on the surrounding property. In Kalispell, Ruis is in the process of purchasing the property at Fifth Avenue West and Center Street from CHS Inc., which stopped using the 100-year-old infrastructure in 2019 when the company relocated to the new Glacier Rail Park northeast of downtown. It's all part of Mick Ruis' vision to help revitalize the valley's downtown areas and build 500 housing units over the next two and a half years. Requests for sewer main location are to be directed to UDIG, call at 40.A Flathead Valley developer plans to transform a property in Kalispell occupied by defunct grain silos into a mixed-use residential and commercial area featuring roughly 230 apartments, bars, restaurants, a hotel, retail space and parking. If you are in need of service after hours, weekends, or holidays please contact 40 and follow the prompt to speak with Dispatch. Public Works Water Division Personnel shall have access to the water meter for reading purposes. The property owner is responsible for all costs associated with water metering, including the cost of the meter. It is the responsibility of the property owner to contract water meter installation. If the property is served by both City water and City sewer, only an Application for Water Service and Water Meter Delivery is necessary. The meter reading is the basis for sewer service charges. Application for Sewer Service & Water MeterĬustomers who are not connected to the City’s water distribution system, but discharge sewage into the City’s sewer collection and wastewater treatment system must have their water service metered. All service outside the city is subject to approval by the City Council. Petitions to Annex are available from the Kalispell Planning Office located at 201 1st Avenue East, Kalispell. Out-of-City Sewer Utility ServiceĪ signed Petition for Annexation form and a signed Waiver of the Right to Protest Annexation form must be submitted to the Public Works Office prior to sewer utility service connection. It is the responsibility of the property owner to maintain the service line from the sewer main connection to the structure including the sewer main tap. Payment for connection and service line installation are the responsibility of the property owner. Call the Public Works Department at 40 for inspection prior to backfill, providing 24-hour minimum notice. Contractor requirements are available at the Public Works Office. Installation must be completed by a bonded and insured contractor. The sewer main connection and service line installation is the property owner’s responsibility. Requirements: Right of Way Permit ($10 Fee) - Inspection prior to backfill. Sewer Main Connection / Service Line Installation
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |